[FLINK-36313] Add Hudi sink connector support #1613
Triggered via pull request
November 21, 2025 04:39
Status
Failure
Total duration
1h 31m 33s
Artifacts
–
flink_cdc_ci.yml
on: pull_request
License Check
6m 39s
Matrix: Common Unit Tests / test
Matrix: Pipeline Unit Tests / test
Matrix: pipeline_e2e
Matrix: Source Unit Tests / test
Matrix: Source E2E Tests / test
Annotations
7 errors
|
License Check
Process completed with exit code 1.
|
|
Pipeline E2E Tests (1-Parallelism) / test (8, 1.19.3, pipeline_e2e)
Process completed with exit code 1.
|
|
Pipeline E2E Tests (4-Parallelism) / test (8, 1.20.3, pipeline_e2e)
Process completed with exit code 1.
|
|
Pipeline E2E Tests (1-Parallelism) / test (8, 1.20.3, pipeline_e2e)
Process completed with exit code 1.
|
|
Pipeline E2E Tests (4-Parallelism) / test (8, 1.19.3, pipeline_e2e)
Process completed with exit code 1.
|
|
Pipeline Unit Tests / test (8, generic, mysql-pipeline)
java.lang.InterruptedException
|
|
Pipeline Unit Tests / test (8, generic, fluss)
The action 'Compile and test' has timed out after 90 minutes.
|