Skip to content

[FLINK-35504] Improve Elasticsearch 8 connector observability #317

[FLINK-35504] Improve Elasticsearch 8 connector observability

[FLINK-35504] Improve Elasticsearch 8 connector observability #317

Triggered via push November 5, 2024 13:02
Status Cancelled
Total duration 12m 12s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

push_pr.yml

on: push
Matrix: compile_and_test
Fit to window
Zoom out
Zoom in

Annotations

20 errors
compile_and_test (1.20-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (8)
Process completed with exit code 1.
compile_and_test (1.20-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (17)
Process completed with exit code 1.
compile_and_test (1.20-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (11)
The job was canceled because "_8" failed.
compile_and_test (1.20-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (21)
The job was canceled because "_8" failed.
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (17)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (17)
The operation was canceled.
compile_and_test (1.19-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (17)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.19-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (21)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (8)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (11)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.18-SNAPSHOT, 8, 11, 17) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.19-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (11)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.19-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (8)
FailFast: cancelling since parallel instance has failed
compile_and_test (1.19-SNAPSHOT, 8, 11, 17, 21) / compile_and_test (8)
The operation was canceled.