Skip to content

chore(deps): bump golang.org/x/crypto from 0.21.0 to 0.35.0 #533

chore(deps): bump golang.org/x/crypto from 0.21.0 to 0.35.0

chore(deps): bump golang.org/x/crypto from 0.21.0 to 0.35.0 #533

Triggered via push April 14, 2025 18:08
Status Failure
Total duration 1m 5s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (openai)
Process completed with exit code 1.
test (rules)
The operation was canceled.
test (rules)
The strategy configuration was canceled because "test.openai" failed
test (pipelines)
The operation was canceled.
test (pipelines)
The strategy configuration was canceled because "test.openai" failed