Skip to content

Unit test smoke test #55

Unit test smoke test

Unit test smoke test #55

Triggered via schedule January 14, 2026 06:55
Status Failure
Total duration 29s
Artifacts

smoke-test.yml

on: schedule
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.9)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.13)
The strategy configuration was canceled because "build._3_9" failed
build (3.13)
The operation was canceled.