Skip to content

feat: upgraded to Pinecone v7 #416

feat: upgraded to Pinecone v7

feat: upgraded to Pinecone v7 #416

Triggered via pull request August 11, 2025 10:04
Status Failure
Total duration 3m 10s
Artifacts

triggers_pr.yml

on: pull_request
Matrix: Lint / build
Matrix: Tests / test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Tests / test (3.10)
Process completed with exit code 1.
Tests / test (3.13)
The operation was canceled.
Tests / test (3.13)
The strategy configuration was canceled because "tests.test._3_10" failed
Lint / build (3.13)
Process completed with exit code 2.