Skip to content

Commit 1b3c717

Browse files
[pre-commit.ci] auto fixes from pre-commit.com hooks
for more information, see https://pre-commit.ci
1 parent e65749f commit 1b3c717

File tree

1 file changed

+11
-9
lines changed

1 file changed

+11
-9
lines changed

data/beps/beps.yml

Lines changed: 11 additions & 9 deletions
Original file line numberDiff line numberDiff line change
@@ -436,15 +436,17 @@
436436
- given-names: Rémi
437437
family-names: Gau
438438
status:
439-
- v1.0 2020-11-09 Initial work on specification with [email protected] [email protected] [email protected]
440-
- v1.0 2021-04 First example of a NIBS-BIDS dataset https://gin.g-node.org/CIMeC/TMS-EEG_brain_connectivity_BIDS
441-
- V1.0 2021-11 Brainhack @Donosti with [email protected] [email protected] and [email protected]
442-
- V1.0 2022-02 First international NIBS-BIDS meeting
443-
- V1.0 2022-11 First update of the BEP
444-
- V2.0 2023-08 BEP 2.0 available with the new NIBS-BIDS logic for describing NIBS experiments
445-
- V3.0 2024-07 BEP 3.0 available with a draft of the final BIDS structure.
446-
- V4.0 2024-11 BEP 4.0 updated with a new, more comprehensive structure. Added int files for offline stimulation. Harmonized parameters with SimNIBS. Use of events and scans files for online stimulation.
447-
- V4.1 2024-12 BEP 4.1 Comments form December 9th, 2024 5th general meeting implemented, added FAQ section. Met with the BIDS maintenance team in January 2025. Agreed on closing the open discussions, lock the google doc and start the PR.
439+
- v1.0 2020-11-09 Initial work on specification with [email protected] [email protected] [email protected]
440+
- v1.0 2021-04 First example of a NIBS-BIDS dataset https://gin.g-node.org/CIMeC/TMS-EEG_brain_connectivity_BIDS
441+
- V1.0 2021-11 Brainhack @Donosti with [email protected] [email protected] and [email protected]
442+
- V1.0 2022-02 First international NIBS-BIDS meeting
443+
- V1.0 2022-11 First update of the BEP
444+
- V2.0 2023-08 BEP 2.0 available with the new NIBS-BIDS logic for describing NIBS experiments
445+
- V3.0 2024-07 BEP 3.0 available with a draft of the final BIDS structure.
446+
- V4.0 2024-11 BEP 4.0 updated with a new, more comprehensive structure. Added int files for offline stimulation. Harmonized parameters with SimNIBS.
447+
Use of events and scans files for online stimulation.
448+
- V4.1 2024-12 BEP 4.1 Comments form December 9th, 2024 5th general meeting implemented, added FAQ section. Met with the BIDS maintenance team in
449+
January 2025. Agreed on closing the open discussions, lock the google doc and start the PR.
448450
blocking:
449451
google_doc_created: 2022-09
450452
pull_request_created:

0 commit comments

Comments
 (0)