Chore: Bump dependency versions (and bump version to 1.2.3 for release) #124
Triggered via pull request
December 10, 2025 22:42
Status
Cancelled
Total duration
6h 0m 44s
Artifacts
–
build.yaml
on: pull_request
Build BlazingMQ as a dependency
8s
Matrix: Test on Linux
Annotations
4 errors
|
Test on Linux (3.9)
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test on Linux (3.9)
The operation was canceled.
|
|
Test on Linux (3.12)
The job has exceeded the maximum execution time of 6h0m0s
|
|
Test on Linux (3.12)
The operation was canceled.
|