Skip to content

feat: add CI/CD workflow with multi-version matrix testing #8

feat: add CI/CD workflow with multi-version matrix testing

feat: add CI/CD workflow with multi-version matrix testing #8

Re-run triggered January 28, 2026 20:18
Status Failure
Total duration 4m 21s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test (Node 24 - Camunda 8.8)
Process completed with exit code 1.
Test (Node 22 - Camunda 8.9)
The strategy configuration was canceled because "test._24_8_8" failed
Test (Node 22 - Camunda 8.8)
The strategy configuration was canceled because "test._24_8_8" failed
Test (Node 22 - Camunda 8.8)
The operation was canceled.
Test (Node 24 - Camunda 8.9)
The strategy configuration was canceled because "test._24_8_8" failed
Test (Node 24 - Camunda 8.9)
The operation was canceled.