Skip to content

Add EraT and CardanoNodeT monad transformers #10948

Add EraT and CardanoNodeT monad transformers

Add EraT and CardanoNodeT monad transformers #10948

Triggered via pull request February 19, 2026 16:38
Status Failure
Total duration 7m 26s
Artifacts 1

ci-nix.yaml

on: pull_request
Matrix: Benchmarks
Matrix: Build & test
Publish benchmark results
0s
Publish benchmark results
Fit to window
Zoom out
Zoom in

Annotations

18 errors
Build & test (hydra-chain-observer, ubuntu-24.04-arm)
Process completed with exit code 1.
Build & test (hydra-tui, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-tui, ubuntu-latest)
The operation was canceled.
Build & test (hydra-plutus, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-plutus, ubuntu-latest)
The operation was canceled.
Build & test (hydra-node, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-node, ubuntu-latest)
The operation was canceled.
Build & test (hydra-node, ubuntu-24.04-arm)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-node, ubuntu-24.04-arm)
The operation was canceled.
Build & test (hydra-chain-observer, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-tx, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-tx, ubuntu-latest)
The operation was canceled.
Build & test (hydra-chain-observer, ubuntu-latest)
The operation was canceled.
Build & test (hydra-cluster, ubuntu-latest)
The strategy configuration was canceled because "build-test.hydra-chain-observer_ub_2" failed
Build & test (hydra-cluster, ubuntu-latest)
The operation was canceled.
Benchmarks (hydra-node, tx-cost, --output-directory $(pwd)/../benchmarks)
The strategy configuration was canceled because "benchmarks.hydra-cluster_bench-e2e_s" failed

Artifacts

Produced during runtime
Name Size Digest
benchmarks-hydra-node-micro
96.6 KB
sha256:694eb3f5d5ead1750ddf1db5c7516056e8ffa0c9dd610761fd1a14e647b0653e