Skip to content

Update CI workflow to include hrn_tests coverage #91

Update CI workflow to include hrn_tests coverage

Update CI workflow to include hrn_tests coverage #91

Triggered via push March 2, 2026 08:47
Status Failure
Total duration 1m 42s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

18 errors
Documentation
Process completed with exit code 101.
build (ubuntu-latest, stable)
Process completed with exit code 101.
build (windows-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, 1.85.0)
The operation was canceled.
build (windows-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, beta)
The operation was canceled.
build (windows-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, stable)
The operation was canceled.
build (ubuntu-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (ubuntu-latest, beta)
The operation was canceled.
build (ubuntu-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (ubuntu-latest, 1.85.0)
The operation was canceled.
build (macos-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, 1.85.0)
The operation was canceled.
build (macos-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, beta)
The operation was canceled.