Skip to content

Fix eof

Fix eof #37

Triggered via push June 15, 2025 14:42
Status Failure
Total duration 1m 20s
Artifacts

test.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
🐹 Test with Go 1.21.x
Process completed with exit code 1.
🐹 Test with Go 1.23.x
The strategy configuration was canceled because "build._1_21_x" failed
🐹 Test with Go 1.22.x
The operation was canceled.
🐹 Test with Go 1.22.x
The strategy configuration was canceled because "build._1_21_x" failed
🐹 Test with Go 1.20.x
The operation was canceled.
🐹 Test with Go 1.20.x
The strategy configuration was canceled because "build._1_21_x" failed