I loaded a FIT directory with about 200 files and this loaded correctly
Most of these are 2025 and 2026 runs
The selection drop-down has a number of "extra" years that then (correctly) show as empty when selected, but should they show at all?
Not a showstopper bug, more an inconvenience/inconsistency.
I loaded a FIT directory with about 200 files and this loaded correctly
Most of these are 2025 and 2026 runs
The selection drop-down has a number of "extra" years that then (correctly) show as empty when selected, but should they show at all?
Not a showstopper bug, more an inconvenience/inconsistency.