Skip to content

test: add integration test infrastructure with .env support #8

test: add integration test infrastructure with .env support

test: add integration test infrastructure with .env support #8

Triggered via push December 21, 2025 23:31
Status Failure
Total duration 1m 17s
Artifacts

ci.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Formatting
Process completed with exit code 1.
MSRV (1.75)
Process completed with exit code 101.
Clippy
Process completed with exit code 101.
Test (ubuntu-latest, beta)
Process completed with exit code 101.
Test (ubuntu-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
Test (ubuntu-latest, stable)
The operation was canceled.
Test (macos-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
Test (macos-latest, stable)
The operation was canceled.
Test (windows-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
Test (windows-latest, stable)
The operation was canceled.
Test (windows-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
Test (windows-latest, beta)
The operation was canceled.
Test (macos-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
Test (macos-latest, beta)
The operation was canceled.