test: add integration test infrastructure with .env support #8
ci.yml
on: push
Formatting
10s
Clippy
40s
Documentation
35s
MSRV (1.75)
13s
Matrix: Test
Annotations
14 errors
|
Formatting
Process completed with exit code 1.
|
|
MSRV (1.75)
Process completed with exit code 101.
|
|
Clippy
Process completed with exit code 101.
|
|
Test (ubuntu-latest, beta)
Process completed with exit code 101.
|
|
Test (ubuntu-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
|
|
Test (ubuntu-latest, stable)
The operation was canceled.
|
|
Test (macos-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
|
|
Test (macos-latest, stable)
The operation was canceled.
|
|
Test (windows-latest, stable)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
|
|
Test (windows-latest, stable)
The operation was canceled.
|
|
Test (windows-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
|
|
Test (windows-latest, beta)
The operation was canceled.
|
|
Test (macos-latest, beta)
The strategy configuration was canceled because "test.ubuntu-latest_beta" failed
|
|
Test (macos-latest, beta)
The operation was canceled.
|