Skip to content

Prepare release 1.5.0 #74

Prepare release 1.5.0

Prepare release 1.5.0 #74

Triggered via push August 16, 2025 13:10
Status Failure
Total duration 2m 27s
Artifacts

swift-tests.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Swift 5.9 on macos-15
Process completed with exit code 1.
Swift 6.0 on macos-15
The operation was canceled.
Swift 6.0 on macos-15
The strategy configuration was canceled because "tests.macos-15_5_9" failed
Swift 5.10 on macos-15
The operation was canceled.
Swift 5.10 on macos-15
The strategy configuration was canceled because "tests.macos-15_5_9" failed
Swift 6.1 on macos-15
The operation was canceled.
Swift 6.1 on macos-15
The strategy configuration was canceled because "tests.macos-15_5_9" failed