Skip to content

Latest commit

 

History

History
13 lines (9 loc) · 2.6 KB

NEXT.md

File metadata and controls

13 lines (9 loc) · 2.6 KB

Start here

Read AGENTS.md and the handoff protocol, then execute ready work from Beads. Beads owns the task list, priorities, dependencies, acceptance criteria and completion evidence; this file is a reusable session prompt.

  1. Inspect git status --short --branch, preserve existing changes, run bd dolt pull, then bd ready.
  2. Select the highest-priority ready task that you can execute (P1 before P2 before P3). Read its full details with bd show <id> and check prerequisite evidence. Skip umbrella epics, human-only tasks, deferred work and tasks already owned by another worker. Do not ask the user which task to pick when the queue provides a clear choice.
  3. Claim it with bd update <id> --claim. Read the named skills and files, implement its scoped deliverable, and run its acceptance checks. Respect review gates; completion of a prerequisite must be supported by evidence.
  4. Record changed paths, decisions, verification results and commit IDs where applicable in the Bead. Close it only when its acceptance criteria pass. If blocked, record the exact blocker and move to another independent ready task; ask the user only when their input is necessary.
  5. Refresh bd ready and continue with the next eligible task. Stop when no eligible work remains or the user asks you to stop. At handoff, run bd dolt push, confirm success, and report completed work, outstanding blockers and repository commit status.

Work sequentially by default. If parallel execution is explicitly requested, use the handoff protocol's file-ownership and integration rules. Do not recreate a backlog in this file or copy live task statuses into Markdown.

Current plan: Factory's PLAN.md (~/src/datasets/factory/PLAN.md) sets the programme goal, the six workstreams and the current priority (14 Nov 2026). DataPressr work serves workstream 2 (Story quality, epic factory-but.2.16) and workstream 3 (Story formats, epic factory-but.9); check bd -C ../factory ready --label focus before this repo's queue. The September next-phase plan is superseded and its epics are deferred. The owner prefers decisions to be made and flagged rather than blocked on: for anything reversible, decide, record the reasoning in the Bead and add the review-after label. Stop only for outward-facing actions in the owner's name (posts, logins, secrets), irreversible deletions and the author's voice passes. Pull requests to repositories in the datasets GitHub org and edits to this repo's inbox issue are within scope. Story outlines are signed off by an independent AI reviewer.