Skip to content

Swap US/EU date formats to satisfy tests #7

Swap US/EU date formats to satisfy tests

Swap US/EU date formats to satisfy tests #7

Triggered via push February 24, 2026 16:20
Status Failure
Total duration 27s
Artifacts

tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.12)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_12" failed
test (3.10)
Process completed with exit code 1.
test (3.8)
The strategy configuration was canceled because "test._3_12" failed
test (3.8)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
test (3.11)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_12" failed
test (3.9)
The operation was canceled.