Skip to content

Alternative for "internal monitoring" of project health #2292

@ChristopherFoerster

Description

@ChristopherFoerster

Up to 4.20 CCM provided a dedicated monitoring page in the settings that checked for each model in a project:

  • is there a backup plan
  • is there a backup
  • is there a diagram cache
  • is there a complexity badge
  • is there a description

Do you intend to replace the dropped functionality again via Grafana or similar?

The feature was quite valuable to check correct configuration of models and backups and indirectly as well the linking to git. Would be great if there is a revival planned. Otherwise we would implement it using REST API and some more advanced data like last backup etc. and put the data into PowerBI.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions