chore(deps): update devdeps (major) #3557
build-and-test-on-pr.yml
on: pull_request
Annotations
10 errors
|
test-browser
Process completed with exit code 1.
|
|
test-integration (5)
Process completed with exit code 1.
|
|
test-integration (3)
The operation was canceled.
|
|
test-integration (3)
The strategy configuration was canceled because "test-integration._5" failed
|
|
test-integration (1)
The operation was canceled.
|
|
test-integration (1)
The strategy configuration was canceled because "test-integration._5" failed
|
|
test-integration (4)
The operation was canceled.
|
|
test-integration (4)
The strategy configuration was canceled because "test-integration._5" failed
|
|
test-integration (2)
The operation was canceled.
|
|
test-integration (2)
The strategy configuration was canceled because "test-integration._5" failed
|