Skip to content

Latest commit

 

History

History
19 lines (10 loc) · 403 Bytes

File metadata and controls

19 lines (10 loc) · 403 Bytes

Rover Team 3

UAH SHC 2023 2-Month Rover Challenge Team 3 (A.S.T.R.A.)

Pico code: embedded

Libre ROS node: ros2_ws

Ground station: gcs

Also includes electrical documents, including schematics and planning layouts for soldering

Team members:

Software: Alistair, David (me), and Anshika

Electrical: David (me), Faye

Mechanical: August (team lead), Matthew, Matthew, Sarah