Skip to content

Fix critical bugs in documentation and library code #27

Fix critical bugs in documentation and library code

Fix critical bugs in documentation and library code #27

Triggered via push October 26, 2025 23:33
Status Failure
Total duration 1m 6s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.11)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_11" failed
test (3.8)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.