For example, the Use case light demo work looked at it this way.
|
Beta Was this translation helpful? Give feedback.
-
|
@ivanperez-keera (from the defs above) when you discussed porting cFS, I assume you'd want to initially try targeting a RT environment where you have full POSIX but limit other userspace dependencies? Then work towards HA? |
Beta Was this translation helpful? Give feedback.
-
|
@matthew-l-weber indeed. I'd probably try to do the same with the light switch example. |
Beta Was this translation helpful? Give feedback.
-
|
Initial ideas around this in slide form for the Gov board call. The mapping table isn't accurate yet but was close enough as an example. |
Beta Was this translation helpful? Give feedback.
-
|
@brian-wood mentioned we should consider understanding the size of cFS SLOC once running on the DO178C-C or above. Brian also asked about which toolchain for which parts. LLVM or GCC and why? |
Beta Was this translation helpful? Give feedback.
-
|
What would a ARM System Ready offering look like across the spread of tiers? |
Beta Was this translation helpful? Give feedback.
-
|
Presented the attached slides at Gov board call. - Feedback focused on next steps and some hesitation on approaching the safety assessment, as it is usually an early step, but for this scope it's lifecycle work. E.g. bringing a code base up to a possible "system assessment" at a lower fault rate then today. |
Beta Was this translation helpful? Give feedback.
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
Tiers
High Assurance (HA) - ASIL D, DO178C-AB
Real-time (RT) -------- ASIL BC, DO178C-C
Standard (STD) ------- ASIL A, DO-178C-DE
Assumptions
Actions (From a App developer angle)