chore(deps): bump very_good_analysis from 8.0.0 to 9.0.0 in /packages/server in the server-deps group #2364
dart.yml
on: pull_request
π€ Check Spelling
/
build
8s
Matrix: ποΈ Build & Test
Annotations
13 errors
|
ποΈ Build & Test (client)
Process completed with exit code 1.
|
|
ποΈ Build & Test (protocol)
Process completed with exit code 1.
|
|
ποΈ Build & Test (protocol)
The strategy configuration was canceled because "build_dart_packages.client" failed
|
|
ποΈ Build & Test (server)
Process completed with exit code 1.
|
|
ποΈ Build & Test (server)
The strategy configuration was canceled because "build_dart_packages.client" failed
|
|
ποΈ Build & Test (cli_client)
The operation was canceled.
|
|
ποΈ Build & Test (cli_client)
The strategy configuration was canceled because "build_dart_packages.client" failed
|
|
ποΈ Build & Test (cli)
The operation was canceled.
|
|
ποΈ Build & Test (cli)
The strategy configuration was canceled because "build_dart_packages.client" failed
|
|
ποΈ Build & Test (db)
The operation was canceled.
|
|
ποΈ Build & Test (db)
The strategy configuration was canceled because "build_dart_packages.client" failed
|
|
ποΈ Build & Test (types)
The operation was canceled.
|
|
ποΈ Build & Test (types)
The strategy configuration was canceled because "build_dart_packages.client" failed
|