Skip to content

fix(audio): fix request_format for Albert integration (#665) #1275

fix(audio): fix request_format for Albert integration (#665)

fix(audio): fix request_format for Albert integration (#665) #1275

Triggered via push January 29, 2026 08:10
Status Failure
Total duration 3m 51s
Artifacts

run_tests.yml

on: push
Unit tests
31s
Unit tests
Matrix: Integration tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Integration tests (api/tests/integ/config.test.yml)
Process completed with exit code 2.
Integration tests (api/tests/integ/config.test.queuing.yml)
The strategy configuration was canceled because "integration-tests.api_tests_integ_config_te" failed
Integration tests (api/tests/integ/config.test.queuing.yml)
The operation was canceled.