Definition of Done
- Specify each stage of the new op-deployer pipeline
- Define all assumption and invariants
Weekly Updates
[2026-MM-DD]
[2026-06-23] PR #921 has been opened with the initial version of the technical specs and is ready for review.
[2026-06-10] Pushed back for Jun, 19. Blocked by the design docs and FMA.
Definition of Done
Weekly Updates
[2026-MM-DD]
[2026-06-23] PR #921 has been opened with the initial version of the technical specs and is ready for review.
[2026-06-10] Pushed back for Jun, 19. Blocked by the design docs and FMA.