Skip to content

test migration

test migration #2619

Triggered via push July 9, 2026 05:57
Status Failure
Total duration 13m 27s
Artifacts

tests.yml

on: push
Matrix: Coverage
Matrix: Lint
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Tests (3.14)
Process completed with exit code 1.
Tests (3.12)
The strategy configuration was canceled because "Tests._3_14" failed
Tests (3.12)
The operation was canceled.
Tests (3.10)
The strategy configuration was canceled because "Tests._3_14" failed
Tests (3.10)
The operation was canceled.