Skip to content

chore: relock after gcl_sdk >=3.2.2 bump #2936

chore: relock after gcl_sdk >=3.2.2 bump

chore: relock after gcl_sdk >=3.2.2 bump #2936

Triggered via push August 3, 2026 17:21
Status Failure
Total duration 1m 2s
Artifacts

tests.yml

on: push
Matrix: Coverage
Matrix: Lint
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
Coverage (3.12)
Process completed with exit code 1.
Tests (3.10)
Process completed with exit code 4.
Tests (3.12)
The strategy configuration was canceled because "Tests._3_10" failed
Tests (3.12)
Process completed with exit code 4.
Tests (3.14)
The strategy configuration was canceled because "Tests._3_10" failed
Tests (3.14)
The operation was canceled.
GoTests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2