chore(deps): update dependency react to v19 #945
Annotations
5 errors
|
Audit (22)
Process completed with exit code 1.
|
|
Audit (20)
The strategy configuration was canceled because "audit._22" failed
|
|
Audit (20)
The operation was canceled.
|
|
Audit (18)
The strategy configuration was canceled because "audit._22" failed
|
|
Audit (18)
The operation was canceled.
|