Data availability check — Method 1 (days_wo_cancellation_score())

Goal of method 1: for a given bus line, score = (# days in the last 15 with zero cancellations) / (# days scored). A day with ≥1 cancellation counts 0, a fully-operated day counts 1.

Which data is needed

There is no direct "cancellation" flag in Stride. A cancellation is inferred: a ride that was planned in the GTFS timetable but for which no actual activity exists. There are three ways to obtain that signal from the API — listed below from simplest to heaviest.


Option A — /rides_execution/list (recommended for Method 1) ✅ VERIFIED

Purpose-built for planned-vs-actual at ride level. One endpoint gives everything.

  • Params (per the OpenAPI schema): line_ref (required, int), operator_ref (required, int), date_from (required), date_to (required), limit, offset, get_count. There is no order_by and no other filter — all four filters must be supplied on every call.
  • Fields returned: planned_start_time, actual_start_time, gtfs_ride_id. That is the whole model.
  • Cancellation signal: a row where actual_start_time is null = that planned ride did not run.
  • Granularity: one row per planned ride.
  • Verified live (2026-07-30): line 2259 / operator 5 / 2026-07-15..29 → 1,790 rows, 6 nulls across 4 distinct days → score 10/15. The signal is real and non-degenerate (contrast Option B). Date filter is by Israel service date (a date_from=2026-07-29 row shows planned_start_time 2026-07-28 21:00 UTC = local midnight).
  • Full end-to-end run: line 480, all 8 variants, 15 days → 1,355 rows over 8 requests, 7 cancellations, score 0.53. Historical windows work too (2025-11-01..15 → 0.81).
# 1. resolve the line -> (line_ref, operator_ref) pairs FOR THIS WINDOW (see caveat below)
routes = stride.get('/gtfs_routes/list', {
    'route_short_name': '480', 'date_from': '2026-07-29', 'date_to': '2026-07-29',
})
pairs = {(r['line_ref'], r['operator_ref']) for r in routes}   # -> 8 pairs for line 480

# 2. one paged call per pair; union the rows
for line_ref, operator_ref in pairs:
    rows = stride.iterate('/rides_execution/list', {
        'line_ref': line_ref, 'operator_ref': operator_ref,
        'date_from': '2026-07-15', 'date_to': '2026-07-29',
    })
    # drop rows with no planned_start_time (see caveat), dedup on planned_start_time,
    # bucket by Asia/Jerusalem date
# per day: cancelled = [r for r in day_rows if not r['actual_start_time']]
# day_is_good = len(cancelled) == 0

Why it matches Method 1: the null check is an unambiguous per-ride cancellation, and query weight is trivial (one request per line variant per window, nowhere near the 15,000-row cap).

Caveats specific to A (all confirmed live, all must be handled)

  1. line_ref is per direction+alternative, not per line. "Line 480" is 8 distinct line_refs today (7020, 7022, 7023, 7024, 7028, 7033, 7034, 10958 — all operator 3), each needing its own call, unioned per day. The set is time-varying: the same line had only 2 line_refs in Nov 2025. Resolve it via /gtfs_routes/list for the window being scored — do not cache one mapping and reuse it.
  2. planned_start_time is null on 3–6% of rows (4–8/day on line 2259). These are actuals with no matching plan — the mirror image of a cancellation. They cannot be bucketed to a service date; filter them out before the day loop or it miscounts (or crashes on the date parse).
  3. Duplicate planned starts exist. 2026-07-26 returned 259 rows for 127 distinct start times (some ×4) under 255 distinct gtfs_ride_ids — one physical departure emitted under several ride ids. Dedup on planned_start_time before counting, or a duplicated row with a null actual becomes a phantom cancellation. (In every sample checked the duplicates all had actuals filled, so it hasn't bitten yet — but the shape is live.)
  4. actual_start_time is a binary flag, not an observed time. For all 1,726 non-null rows sampled, actual_start_time == planned_start_time to the second. Fine for the null check; but this endpoint can never be reused for delay/punctuality work, and "actual" here is not a ground-truth departure time.
  5. Use real Asia/Jerusalem, not a fixed UTC+3. A hardcoded +3 spills a 16th day into a 15-day November window — Israel is UTC+2 in winter. The "Israel service date" note above only holds under summer time.

Option B — /gtfs_rides_agg/list — ❌ NOT VIABLE on this deployment

Pre-aggregated planned-vs-actual counts. On paper the lightest option (one row per route×hour). In practice it cannot detect cancellations on this API instance: num_actual_rides is always 0.

  • Params: date_from (required), date_to (required), exclude_hours_from, exclude_hours_to, limit, offset. No line_ref, operator_ref, or gtfs_route_id filter on /list.
  • Fields returned: gtfs_route_id, gtfs_route_hour, num_planned_rides, num_actual_rides, operator_ref.
  • Cancellation signal (broken): num_planned_rides − num_actual_rides.

Live check (2026-07-30) — blocker: across both /list and /group_by, on every date sampled from Nov 2025 → Jul 2026, num_actual_rides = 0 for every line, network-wide while num_planned_rides is populated. The actual-rides column is never filled in this deployment, so the signal reports 100% cancellation everywhere.

Date Σ planned Σ actual
2026-07-01 3,498 0
2026-06-15 3,510 0
2026-04-01 3,227 0
2025-11-01 3,927 0

Not lag: line 2259 / 2026-07-29 shows total_actual_rides=0 in the aggregate, yet Option A shows real actual_start_time values and 0 cancellations for the same line/date — actuals exist at ride level, just not rolled into the aggregate.

(Correction, 2026-07-30: an earlier version of this doc claimed A returns 219 planned rows for that line/date vs the aggregate's 123, and used the mismatch as a second strike against B. A actually returns 126, which matches the aggregate closely. The planned counts agree; B is ruled out solely because num_actual_rides is never populated.)

Silver lining (didn't rescue B): /gtfs_rides_agg/group_by accepts group_by= any of gtfs_route_date, gtfs_route_hour, operator_ref, day_of_week, line_ref, returning route_short_name/route_long_name + total_planned_rides/total_actual_rides. So a clean per-line, per-day planned rollup is available (the earlier "no line_ref filter" caveat was wrong) — but with actuals stuck at 0 it still can't score cancellations.

# What was tried:
rows = stride.get('/gtfs_rides_agg/group_by', {
    'date_from': '2026-07-29', 'date_to': '2026-07-29',
    'group_by': 'line_ref,gtfs_route_date',
})
# -> line 2259: total_planned_rides=123, total_actual_rides=0   (actual always 0)

Option C — GTFS timetable vs SIRI diff (heaviest; only for degraded-ride detection)

Build the planned start-set and the actual start-set separately and diff them. This is the manual method demonstrated in the compare gtfs planned vs siri actual notebook.

  • Line identity (once): /gtfs_routes/list with route_short_name, operator_refs, agency_name, date_from/date_toline_ref, operator_ref.
  • Planned rides: /route_timetable/list with line_refs, planned_start_time_date_from/..._date_to → distinct set of gtfs_line_start_time.
  • Actual rides: /siri_rides/list (one row per ride; lighter) or /siri_vehicle_locations/list, filtered by siri_route__line_refs, siri_route__operator_refs, scheduled_start_time_from/..._to → distinct set of scheduled_start_time.
  • Cancellation signal: cancelled = planned_starts − actual_starts (match on scheduled start-time).
  • Granularity: one row per timetable stop / per SIRI location ping — the heaviest pull.
  • Only reason to use it: it carries the full vehicle traces, so it can additionally flag degraded rides (started but died mid-route), which A and B cannot see.

Comparison

A · /rides_execution/list B · /gtfs_rides_agg C · GTFS vs SIRI diff
Granularity 1 row per ride 1 row per route×hour (or per-line/day via group_by) 1 row per stop / location ping
Rows for 1 line, 15 d ~1,400–1,800 (measured) ~hundreds thousands (heaviest)
Cancellation signal actual_start_time is null num_planned − num_actual planned start-set − actual start-set
Filter by line? line_ref + operator_ref (both required; 1 call per line variant) ⚠️ client-side (group_by line_ref) ✅ direct
Matches Method 1 signature ✅ after a /gtfs_routes line_ref lookup ➖ needs client-side filter ➖ two queries + manual diff
Detects fully-cancelled actuals always 0
Detects degraded/partial ⚠️ possible
Usable for delay/punctuality actual == planned always
Query weight light (8 requests for line 480 / 15 d) lightest (if it worked) heaviest
Verified working ✅ live 2026-07-30, non-degenerate num_actual=0 network-wide notebook-confirmed

Recommendation: Method 1 → A, confirmed by a live end-to-end run. Option B is ruled out on this deployment (actuals never populated), so Methods 2 & 3 (per-operator / cross-operator) also fall back to A. A is far lighter than the doc originally assumed, but it fans out per line_ref: Method 2 needs every line variant of an operator resolved from /gtfs_routes/list first, which is where the real request count lives. Use /gtfs_rides_agg/group_by only for planned-ride denominators. Reserve C for when degraded-ride detection or actual timing is wanted.


The 15-day loop (applies to whichever option)

  • Iterate the 15 service dates; derive per-day planned + cancelled counts.
  • score = (# good days) / (# scored days), where a good day has zero cancellations.
  • Exclude days with no planned rides at all (line not in service / no timetable) from "# scored days" so they count as neither good nor bad.

Edge cases / caveats to decide on

  • Matching key / timezone: compare planned vs actual on scheduled start-time in the same timezone; the date_from filter is by Israel service date (see Option A note). Bucket days with zoneinfo.ZoneInfo("Asia/Jerusalem") — a fixed UTC+3 offset breaks on winter dates (A-caveat 5).
  • Partial rides: a ride that started but died mid-route still has an actual_start_time, so A and B count it as operated. Only Option C can flag it. Note A cannot even tell you when it started — actual_start_time always equals planned_start_time (A-caveat 4).
  • Unplanned rides: A returns rows with a null planned_start_time (~3–6%/day). Not cancellations — the opposite. Drop them (A-caveat 2).
  • Missing SIRI ingestion vs a real cancellation: a day where actual data is globally absent (feed outage) looks like 100% cancellations. Consider a sanity floor (e.g. skip days where the operator has ~zero actuals across all lines).
  • line_ref / route variants: one line number maps to several variants (line 480 → 8 today, 2 in Nov 2025) — resolve them per window and aggregate carefully so a variant that simply wasn't scheduled that day isn't read as a cancellation. Also dedup on planned_start_time: the same departure can appear under several gtfs_ride_ids (A-caveats 1 and 3).
  • Row limits: a single request caps at 15,000 (server abuse guard); use stride.iterate (pages within that limit) rather than a large single limit.