Depend on the gRPC layer for connection state changes #7518
test.yml
on: pull_request
generate
4m 10s
unit
1m 31s
integration
1m 54s
e2e
2m 53s
e2e-pgmq
2m 59s
Matrix: load
Matrix: rampup
Annotations
8 errors
|
unit
Process completed with exit code 1.
|
|
integration
Process completed with exit code 1.
|
|
e2e
Process completed with exit code 1.
|
|
e2e-pgmq
Process completed with exit code 1.
|
|
rampup (latest, true, 15-alpine)
Process completed with exit code 1.
|
|
load (latest, true, 17-alpine, false)
Process completed with exit code 1.
|
|
load (latest, true, 17-alpine, true)
The strategy configuration was canceled because "load.latest_true_17-alpine_fal" failed
|
|
load (latest, true, 17-alpine, true)
Process completed with exit code 1.
|