Skip to content

ver 3.3.0

ver 3.3.0 #289

Triggered via push February 7, 2026 21:53
Status Failure
Total duration 39s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 30.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.