Skip to content

fix: handle ThinOrFullLTOPhase, fix #30 #255

fix: handle ThinOrFullLTOPhase, fix #30

fix: handle ThinOrFullLTOPhase, fix #30 #255

Re-run triggered August 9, 2025 13:23
Status Failure
Total duration 50s
Artifacts

linux.yml

on: pull_request
Matrix: linux-tests-lld
Matrix: linux-tests-opt
Fit to window
Zoom out
Zoom in

Annotations

28 errors
LLVM/LLD 20 Linux
Process completed with exit code 101.
LLVM/LLD 13 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 16 Linux
The operation was canceled.
LLVM/LLD 16 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/OPT 11 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 20 Linux
Process completed with exit code 101.
LLVM/OPT 13 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 15 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 12 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 19 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/LLD 15 Linux
The operation was canceled.
LLVM/LLD 15 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/OPT 16 Linux
The operation was canceled.
LLVM/OPT 16 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/LLD 17 Linux
The operation was canceled.
LLVM/LLD 17 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 19 Linux
The operation was canceled.
LLVM/LLD 19 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 11 Linux
The operation was canceled.
LLVM/LLD 11 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 14 Linux
The operation was canceled.
LLVM/LLD 14 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 12 Linux
The operation was canceled.
LLVM/LLD 12 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/LLD 18 Linux
The operation was canceled.
LLVM/LLD 18 Linux
The strategy configuration was canceled because "linux-tests-lld._20_20-1_1_87_v20_1_1-rus" failed
LLVM/OPT 17 Linux
The operation was canceled.
LLVM/OPT 17 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed