Skip to content

fix: handle ThinOrFullLTOPhase, fix #30 #256

fix: handle ThinOrFullLTOPhase, fix #30

fix: handle ThinOrFullLTOPhase, fix #30 #256

Re-run triggered August 9, 2025 13:28
Status Failure
Total duration 2m 42s
Artifacts

linux.yml

on: pull_request
Matrix: linux-tests-lld
Matrix: linux-tests-opt
Fit to window
Zoom out
Zoom in

Annotations

11 errors
LLVM/OPT 20 Linux
Process completed with exit code 101.
LLVM/OPT 13 Linux
The operation was canceled.
LLVM/OPT 13 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 11 Linux
The operation was canceled.
LLVM/OPT 11 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 19 Linux
The operation was canceled.
LLVM/OPT 19 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 15 Linux
The operation was canceled.
LLVM/OPT 15 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed
LLVM/OPT 17 Linux
The operation was canceled.
LLVM/OPT 17 Linux
The strategy configuration was canceled because "linux-tests-opt._20_20-1_v20_1_1-rust-1_8" failed