Intial project setup #1
Annotations
8 errors and 4 warnings
|
coverage
Process completed with exit code 2.
|
|
build-linux (gcc, Release)
Process completed with exit code 1.
|
|
build-linux (clang, Debug)
The strategy configuration was canceled because "build-linux.gcc_Release" failed
|
|
build-linux (clang, Debug)
The operation was canceled.
|
|
build-linux (gcc, Debug)
The strategy configuration was canceled because "build-linux.gcc_Release" failed
|
|
build-linux (gcc, Debug)
The operation was canceled.
|
|
build-linux (clang, Release)
The strategy configuration was canceled because "build-linux.gcc_Release" failed
|
|
build-linux (clang, Release)
The operation was canceled.
|
|
build-macos (Debug)
ninja 1.13.1 is already installed and up-to-date.
To reinstall 1.13.1, run:
brew reinstall ninja
|
|
build-macos (Debug)
cmake 4.1.2 is already installed and up-to-date.
To reinstall 4.1.2, run:
brew reinstall cmake
|
|
build-macos (Release)
ninja 1.13.1 is already installed and up-to-date.
To reinstall 1.13.1, run:
brew reinstall ninja
|
|
build-macos (Release)
cmake 4.1.2 is already installed and up-to-date.
To reinstall 4.1.2, run:
brew reinstall cmake
|