Skip to content

chore: lint

chore: lint #191

Triggered via push February 3, 2026 08:44
Status Failure
Total duration 1m 12s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 255.
build (3.7)
The strategy configuration was canceled because "build._3_11" failed
build (3.7)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.9)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_11" failed
build (3.8)
The operation was canceled.