Status: DRAFT — work-in-progress. Coordination required with Frank Moyer + Stu Hume.
Sign-off touchpoints
| When |
What |
Who signs |
Channel |
| 2026-05-13 |
Listing copy (Bundle 1) — tagline + long description + features + use cases |
Frank Moyer (CEO) |
Email — async, short |
| 2026-05-14 |
Plugin icon SVG + brand-usage permission (Bundle 2) |
Stu Hume (VP Product Eng) |
Email — Kobiton-side delivers the asset, Jeremy confirms received |
| 2026-05-16 |
Staging URL review (Bundle 3) |
Both Frank + Stu |
Email with staging URL — async, 24h SLA |
| 2026-05-17 |
Live-flip sign-off (Bundle 3) |
Both Frank + Stu |
Email or Slack — explicit "Yes, ship" before flip |
| 2026-05-18 |
Confirm listing live + screenshot taken |
Both Frank + Stu (FYI only) |
Email — Jeremy confirms post-flip |
What goes in each email
Per CLAUDE.md operational rule #1 (Stu directs via GitHub, not email — but for partner-marketing coordination, email is appropriate because Frank/Stu both have decision authority here that doesn't fit GitHub's issue surface).
Email 1 (2026-05-13) — Subject: "Kobiton M3 listing — copy for sign-off (10 min review)"
- Listing tagline + long description + features + use cases inline
- Three tagline options (A/B/C) with default
- Ask: which tagline option, any wording changes, OK on long description?
- Footer: clean signature
- Jeremy Longshore / intentsolutions.io per CLAUDE.md rule 8
Email 2 (2026-05-14) — Subject: "Kobiton plugin icon SVG needed for M3 listing (low lift)"
- Specs: 64×64, 256×256, SVG, transparent background, license to use in tonsofskills.com listing
- Fallback noted: if not available by 2026-05-16, falls back to repo logo (suboptimal)
- Ask: please send by 2026-05-16
Email 3 (2026-05-16) — Subject: "Kobiton M3 listing staging URL (review before 5/18 live-flip)"
- Staging URL (basicauth or unlisted)
- Tagline / copy as live; visual assets in place
- Ask: any final changes? Any compliance/legal concerns?
Email 4 (2026-05-17) — Subject: "Kobiton M3 listing — final live-flip sign-off (yes/no)"
- One-line ask: "Sign-off to flip listing live 2026-05-18 00:00 ET?"
- Quick reply expected — Frank/Stu both required
Email 5 (2026-05-18, post-flip) — Subject: "Kobiton M3 listing is live"
- Confirm live URL + post-flip screenshot
- FYI only, no response expected
- 1-week M3 window now running through 2026-05-25
Sign-off gates
Source
kobiton/000-docs/038-DR-MKTG-m3-featured-plugin-assets-and-listing.md § "Action items"
Status: DRAFT — work-in-progress. Coordination required with Frank Moyer + Stu Hume.
Sign-off touchpoints
What goes in each email
Per CLAUDE.md operational rule #1 (Stu directs via GitHub, not email — but for partner-marketing coordination, email is appropriate because Frank/Stu both have decision authority here that doesn't fit GitHub's issue surface).
Email 1 (2026-05-13) — Subject: "Kobiton M3 listing — copy for sign-off (10 min review)"
- Jeremy Longshore / intentsolutions.ioper CLAUDE.md rule 8Email 2 (2026-05-14) — Subject: "Kobiton plugin icon SVG needed for M3 listing (low lift)"
Email 3 (2026-05-16) — Subject: "Kobiton M3 listing staging URL (review before 5/18 live-flip)"
Email 4 (2026-05-17) — Subject: "Kobiton M3 listing — final live-flip sign-off (yes/no)"
Email 5 (2026-05-18, post-flip) — Subject: "Kobiton M3 listing is live"
Sign-off gates
Source
kobiton/000-docs/038-DR-MKTG-m3-featured-plugin-assets-and-listing.md§ "Action items"