Skip to content

SPH read? (WIT inverter) #627

Description

@tissson

bess-debug-2026-08-17-191722.md

What happened

It seems Bess Manager have automatically chosen SPH even though I am using a Growatt WIT (low voltage) hybrid inverter. I have added all the necessary sensors manually and it seems to work except for the dashboard triggering errors (growatt server read ac charge times) and (critical system issues deteced, system health check)

Growatt WIT detected as growatt_server_sph

BESS auto-detects my Growatt WIT as MIX/SPA/SPH (DC-coupled).

All sensors are detected correctly:

  • SOC
  • Charge power
  • Discharge power
  • Battery capacity
  • PV
  • Grid

But BESS repeatedly calls:

growatt_server.read_ac_charge_times

which returns:

500 Server Error

Demo Mode works fine but no schedule is created.

Is WIT currently supported or should another platform be selected?

Metadata

Metadata

Assignees

No one assigned

    Labels

    analyzedRoot-cause diagnosis posted, awaiting @claude-bot fixbugSomething isn't working

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions