Skip to content

Change log message to note hardlink #139

Change log message to note hardlink

Change log message to note hardlink #139

Triggered via push September 27, 2025 03:15
Status Failure
Total duration 2m 7s
Artifacts

ruby.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.1)
Process completed with exit code 1.
test (2.7)
The operation was canceled.
test (2.7)
The strategy configuration was canceled because "test._3_1" failed
test (3.4)
The operation was canceled.
test (3.4)
The strategy configuration was canceled because "test._3_1" failed
test (3.0)
The operation was canceled.
test (3.0)
The strategy configuration was canceled because "test._3_1" failed