Project Progress

Purpose

This is the project control ledger. It answers four questions without requiring someone to reconstruct history from chat:

  1. Which milestone and unit are active?
  2. What has been accepted by a human reviewer?
  3. What evidence supports each accepted unit?
  4. What is the next permitted unit of work?

This file tracks delivery state. It does not replace the product contract, milestone plans, ADRs, learning notes, tests, or Git history.

Sources of truth

When documents appear to disagree, use this order:

  1. PROJECT_GOALS.md defines the product boundary, development contract, and canonical commit-sized milestone sequence.
  2. This file records current status and accepted evidence.
  3. docs/milestones/M*.md defines the execution plan and invariants for one milestone.
  4. docs/adr/ records accepted architectural decisions.
  5. docs/learning/ explains behavior that has actually been implemented.
  6. PI_CODE_MODE_ROADMAP.md is the strategic architecture roadmap and comparison backlog; its milestone labels are not commit identifiers.

Tests and running behavior outrank prose when they reveal a contradiction. A contradiction must be reported and resolved; it must not be silently rationalized.

Status vocabulary

Status Meaning Who may set it
Not started Planned, but its prerequisites or handoff are not yet ready. Planner or reviewer
Ready Scope, invariants, and verification are defined; implementation may begin. Planner or reviewer
In progress An implementer is working on this unit and no later unit may begin. Implementer
Ready for review Implementation stopped at the checkpoint with evidence recorded. Implementer
Accepted A human reviewed the diff, learning note, demonstration, and failure path. Human reviewer only
Blocked A named prerequisite prevents useful progress and evidence is recorded. Implementer or reviewer
Deferred Explicitly outside the current delivery phase. Planner or reviewer

An implementer must never mark its own unit Accepted. Passing automated checks makes a unit ready for review, not accepted.

Current checkpoint

Field Value
Delivery phase V0
Active milestone M0 — Foundation and executable specification
Active unit M0.1 — Scaffold the package
Unit status Ready for review
Accepted V0 units 0 / 35
Last accepted unit None
Next permitted work Human review of M0.1; do not begin M0.2
Stop point Human review after M0.1; do not begin M0.2

V0 milestone summary

Milestone Outcome Units Accepted Status Plan
M0 Loadable extension skeleton and executable V0 specification 3 0 In progress M0 plan
M1 Reliable persistent Bun subprocess and versioned IPC 6 0 Not started Create after M0 is accepted
M2 Persistent TypeScript notebook semantics 7 0 Not started Create after M1 is accepted
M3 Pi tools callable from TypeScript 8 0 Not started Create after M2 is accepted
M4 Complete Pi-facing code-tool experience and output discipline 6 0 Not started Create after M3 is accepted
M5 Compatibility evidence, benchmarks, documentation, and V0 decision 5 0 Not started Create after M4 is accepted

M0 unit ledger

Unit Behavioral outcome Status Implementation commit Learning note Review evidence
M0.1 Pi can load a deliberately inert Bun/TypeScript package skeleton and its checks run Ready for review docs/learning/M0.1-package-scaffold.md See evidence log
M0.2 Trusted execution requires explicit opt-in and communicates shell-equivalent authority Not started Planned: docs/learning/M0.2-trust-contract.md
M0.3 Executable fixtures define implemented and pending V0 behavior Not started Planned: docs/learning/M0.3-acceptance-fixtures.md

Post-V0 milestone summary

These milestones remain visible but are not authorized implementation work during V0.

Milestone Outcome Status
M6 Durable, branch-correct sessions Deferred
M7 Capability policy and suspend/resume approvals Deferred
M8 Remote full Bun runtime Deferred
M9 Capability-only TypeScript sandbox Deferred
M10 Rich orchestration and output Deferred
M11 Saved tools and broader discovery Deferred

Evidence log

Add one row when a unit moves to Ready for review, then amend the same row after human acceptance. Never claim a check that was not run.

Date Unit State Commit Verification Human reviewer Notes
2026-07-19 M0.1 Ready for review bun install --frozen-lockfile exit 0; bun run typecheck exit 0; bun test 3 pass; bun run check exit 0; bun run smoke:pi exit 0 (project-pinned Pi 0.80.10 loaded package root, answered RPC, and rejected a missing-extension control). Bun 1.3.11; host Pi 0.80.6 was recorded but is not the smoke runtime. Scaffold only; inert factory; stop for human review.

Update protocol

For each implementation unit:

  1. Confirm the prior unit is Accepted; M0.1 is the only bootstrap exception.
  2. Read the canonical goals, this ledger, the active milestone plan, relevant ADRs, and the previous learning note.
  3. Change only the active unit to In progress.
  4. Implement only that unit and produce the evidence required by its milestone plan.
  5. Add or update its learning note.
  6. Change the unit to Ready for review, update milestone counts, and add an evidence-log row.
  7. Stop. Do not start the next unit and do not create a commit unless explicitly asked.
  8. After review, the human changes the unit to Accepted, records the commit, and authorizes the next plan.

If implementation reveals that the plan is wrong, stop and propose a plan change. Do not widen scope while preserving the appearance that the original plan was followed.

Progress invariants

  • Exactly zero or one unit may be In progress.
  • A later unit cannot be In progress, Ready for review, or Accepted while an earlier prerequisite is unaccepted.
  • Accepted counts equal the number of unit rows marked Accepted.
  • Every accepted implementation unit has one focused commit and one learning note.
  • Every evidence claim names the command, fixture, or human demonstration that produced it.
  • A skipped, unavailable, or flaky check is not a passing check.
  • Planning-only commits do not increment accepted implementation-unit counts.
  • Scope changes update the goals and active milestone plan before implementation continues.