Android CI (Connected) #1970
schedule.yml
on: schedule
Check latest commit
5s
Matrix: connectedCheck
Annotations
6 errors
|
Check latest commit
Process completed with exit code 1.
|
|
connectedCheck (31)
The process '/usr/bin/sh' failed with exit code 1
|
|
connectedCheck (24)
The strategy configuration was canceled because "connectedCheck._31" failed
|
|
connectedCheck (24)
The operation was canceled.
|
|
connectedCheck (34)
The strategy configuration was canceled because "connectedCheck._31" failed
|
|
connectedCheck (34)
The operation was canceled.
|