Skip to content

CI

CI #2980

Manually triggered February 10, 2026 13:28
Status Failure
Total duration 36m 13s
Artifacts

ci.yml

on: workflow_dispatch
Detect changes
8s
Detect changes
Shellcheck
6s
Shellcheck
Helm unittest
8s
Helm unittest
Calculate crates matrix
5s
Calculate crates matrix
Build kwctl  /  Detect kwctl changes
4s
Build kwctl / Detect kwctl changes
Go tests
4m 20s
Go tests
Go e2e tests
35m 30s
Go e2e tests
Golangci-lint
28s
Golangci-lint
Validate Hauler manifest
5s
Validate Hauler manifest
Matrix: clippy-rust-per-crate
Matrix: fmt-rust-per-crate
Matrix: unit-tests-rust-per-crate
E2E tests (burrego)
2m 5s
E2E tests (burrego)
E2E tests (kwctl)
10m 53s
E2E tests (kwctl)
E2E tests sigstore (kwctl)
9m 19s
E2E tests sigstore (kwctl)
Integration tests (policy-server)
12m 50s
Integration tests (policy-server)
Integration tests (policy-evaluator)
17m 12s
Integration tests (policy-evaluator)
Matrix: Build kwctl / Build darwin binary
Matrix: Build kwctl / Build linux binaries
Matrix: Build kwctl / Build windows (x86_64) binary
CI Success
3s
CI Success
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Rustfmt (policy-server)
Process completed with exit code 2.
Rustfmt (kwctl)
The strategy configuration was canceled because "fmt-rust-per-crate.policy-server" failed
Rustfmt (burrego)
The strategy configuration was canceled because "fmt-rust-per-crate.policy-server" failed
Rustfmt (policy-fetcher)
The strategy configuration was canceled because "fmt-rust-per-crate.policy-server" failed
Rustfmt (policy-evaluator)
The strategy configuration was canceled because "fmt-rust-per-crate.policy-server" failed
Integration tests (policy-server)
Process completed with exit code 2.
Go e2e tests
Process completed with exit code 2.
CI Success
Process completed with exit code 1.