Description
The meeting will take place on Monday 2024/07/29 at 8pm UTC (5:30am Adelaide time) on Libera Chat IRC #lightning-dev. It is open to the public.
A video link is available for higher bandwidth communication: https://meet.jit.si/Lightning-Spec-Meeting
Recently Updated Proposals / Seeking Review
This section contains changes that have been opened or updated recently and need feedback from the meeting participants.
- Clarify route blinding spec Clarify onions part 2: a bit deeper rework #1182
- gossip_status BOLT 7:
gossip_status
(feature 66/67) #1186 - Offers Offers #798
- Bolt 12 contacts / mutual message auth (Add blip-0031, a protocol for mutual message exchange blips#31 and blip-0042: Bolt 12 Contacts blips#42)
- Taproot extension-bolt: simple taproot channels (feature 80/81) #995
- Taproot gossip extension-bolt: taproot gossip (features 32/33) #1059
- Channel jamming draft: Staking Credentials token issuance/redemption #1043 draft: HTLC Endorsement to Mitigate Channel Jamming #1071 blip-0004: experimental endorsement signaling in update_add_htlc blips#27
- Liquidity ads option_will_fund: liquidity ads #878 Extensible Liquidity Ads #1153
- Async payments Support async payments in BOLT 12 #1149
- Splicing Splice draft (feature 62/63) #863 Channel Splicing (feature 62/63) #1160
-
Dynamic Commitments Extension/dynamic commitments #1117 vs Upgrade on Reestablish BOLT 2: upgrade protocol on reestablish #868 -
Peer storage backup Peer backup storage (feature 40/41/42/43) #881 or Peer storage for nodes to distribute small encrypted blobs. #1110 -
DNS-based offers Define a mechanism for looking up an offer from a user/domain pair #1136 -
BIP 353 name in offers Include BIP 353 name info ininvoice_request
s #1180 -
Attributable errors Attributable failures (feature 36/37) #1044 -
Clarifychannel_reestablish
requirements Clarifychannel_reestablish
requirements #1049 or Reworkchannel_reestablish
requirements #1051
Stale Proposals
This section contains pending changes that may not need feedback from the meeting participants, unless someone explicitly asks for it during the meeting. These changes are usually waiting for implementation work to happen to drive more feedback.
-
Inbound fees Inbound routing fees blips#18 and Add a bLIP for backwards-compatible inbound fees blips#22
Waiting for interop
This section contains changes that have been conceptually ACKed and are waiting for at least two implementations to fully interoperate.
They most likely don't need to be covered during the meeting, unless someone asks for updates.
-
Simplified mutual close option_simple_close (features 60/61) #1096 - Trampoline routing Trampoline Routing (2021 edition) (Feature 56/57) #829 and Trampoline onion format (Feature 56/57) #836
-
Zero reserve Addoption_zero_reserve
(FEATURE 64/65) #1140 (follow-up on bolt2: relax channel_reserve_satoshis requirements #1133 to include a feature bit) -
Don't force close until error is received afterchannel_reestablish
Nodes shouldn't publish their commitment when receiving outdatedchannel_reestablish
#934
Long Term Updates
This section contains long-term changes that need review, but require a substantial implementation effort.
-
Simplified commitment Feature 106/107: option_simplified_update. #867 -
lnprototest (https://github.com/rustyrussell/lnprototest)