Description
The meeting will take place on Monday 2025/04/21 at 8pm UTC (5:30am Adelaide time) on Libera Chat IRC #lightning-dev. It is open to the public.
A video link is available for higher bandwidth communication: https://meet.jit.si/Lightning-Spec-Meeting
Recently Updated Proposals / Seeking Review
This section contains changes that have been opened or updated recently and need feedback from the meeting participants.
- Clarify Bolt 11 invoice requirements Clarify Mandatory Field Length Requirements and Add Note on Low R Signatures in BOLT 11 #1243
- Require minimally encoded Bolt 11 invoices Require minimally-encoded features in BOLT 11 invoices #1245
- Remove CoC Remove the CoC.md (attempt #3) #1248
- Dual funding reconnect
commit_sig
retransmission Do not unnecessarily retransmitcommitment_signed
in dual funding #1214 - Allow non-initiator to RBF dual-funded channels Allow either node to send
tx_init_rbf
in v2 establishment #1236 - Splicing Channel Splicing (feature 62/63) #1160
- Taproot extension-bolt: simple taproot channels (feature 80/81) #995
- Taproot gossip extension-bolt: taproot gossip (features 32/33) #1059
- BOLT 12 recurrence BOLT 12: re-add recurrence support. #1240
-
Trampoline routing Trampoline Routing (2021 edition) (Feature 56/57) #829 and Trampoline onion format (Feature 56/57) #836 -
Async payments Support async payments in BOLT 12 #1149 -
Dynamic Commitments Extension/dynamic commitments #1117 -
Attributable errors Attributable failures (feature 36/37) #1044 -
Assumeoption_channel_type
Assumeoption_channel_type
#1232 -
0-fee commitments Zero-fee commitments using v3 transactions (feature 40/41) #1228 -
Channel jamming draft: HTLC Endorsement to Mitigate Channel Jamming #1071 Project Updates: Hybrid Channel Jamming Mitigation #1218 -
Bolt 12 contacts: blip-0042: Bolt 12 Contacts blips#42 -
Liquidity ads Extensible Liquidity Ads #1153
Stale Proposals
This section contains pending changes that may not need feedback from the meeting participants, unless someone explicitly asks for it during the meeting. These changes are usually waiting for implementation work to happen to drive more feedback.
-
Inbound fees Inbound routing fees blips#18 and Add a bLIP for backwards-compatible inbound fees blips#22
Waiting for interop
This section contains changes that have been conceptually ACKed and are waiting for at least two implementations to fully interoperate.
They most likely don't need to be covered during the meeting, unless someone asks for updates.
-
Zero reserve Addoption_zero_reserve
(FEATURE 64/65) #1140 (follow-up on bolt2: relax channel_reserve_satoshis requirements #1133 to include a feature bit) -
Don't force close until error is received afterchannel_reestablish
Nodes shouldn't publish their commitment when receiving outdatedchannel_reestablish
#934
Long Term Updates
This section contains long-term changes that need review, but require a substantial implementation effort.
-
Simplified commitment Feature 106/107: option_simplified_update. #867 -
lnprototest (https://github.com/rustyrussell/lnprototest)