chore: Prepare release 2.18.0 #6054
ci.yml
on: pull_request
Matrix: test
validate
28s
Test Minimal Pydantic 1 application
34s
mypy
1m 4s
pyright
48s
slotscheck
20s
Test Minimal Application with Base Dependencies
24s
Matrix: test-platform-compat
Waiting for pending jobs
Matrix: Test server integration
Matrix: test_typing_extensions
test_success
4s
codeql
build-docs
2m 26s
upload-test-coverage
Annotations
15 errors
|
test (3.13) / test
Process completed with exit code 1.
|
|
test (3.9) / test
The strategy configuration was canceled because "test._3_13" failed
|
|
test (3.11) / test
The strategy configuration was canceled because "test._3_13" failed
|
|
test (3.10) / test
The operation was canceled.
|
|
test (3.10) / test
The strategy configuration was canceled because "test._3_13" failed
|
|
test (3.12) / test
The operation was canceled.
|
|
test (3.12) / test
The strategy configuration was canceled because "test._3_13" failed
|
|
test (3.8) / test
The operation was canceled.
|
|
test (3.8) / test
The strategy configuration was canceled because "test._3_13" failed
|
|
test_success
Process completed with exit code 1.
|
|
Tests And Linting
The strategy configuration was canceled because "test._3_13" failed
|
|
Tests And Linting
The strategy configuration was canceled because "test._3_13" failed
|
|
Tests And Linting
The strategy configuration was canceled because "test._3_13" failed
|
|
Tests And Linting
The strategy configuration was canceled because "test._3_13" failed
|
|
Tests And Linting
The strategy configuration was canceled because "test._3_13" failed
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
coverage-data-pydantic_v1-
Expired
|
247 KB |
sha256:326fc28937d7840353c4fbdaf43f0656f61664ca49c32fc7902b58fa135b6a59
|
|
|
docs-preview
Expired
|
6.02 MB |
sha256:22a0871e8e43572615ccc03d61a40bbc8a7c14025f273f98eb7f6729f0bf8ce2
|
|