Skip to content

Commit 7c2b3ad

Browse files
committed
Create ROADMAP.md for replication module production readiness
1 parent d8c9747 commit 7c2b3ad

1 file changed

Lines changed: 39 additions & 0 deletions

File tree

src/replication/ROADMAP.md

Lines changed: 39 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,39 @@
1+
# Replication Module Production Readiness Roadmap
2+
3+
## Overview
4+
The Replication Module is a key component of ThemisDB, providing systems with data replication capabilities. This roadmap outlines the phases, timelines, implementation details, and success criteria for achieving production readiness.
5+
6+
## Phases
7+
8+
### Phase 1: Requirements Gathering
9+
- **Timeline**: February 2026 - March 2026
10+
- **Details**: Collect input from stakeholders to define functional and non-functional requirements for the replication module.
11+
- **Success Criteria**: Documented requirements approved by all stakeholders.
12+
13+
### Phase 2: Design
14+
- **Timeline**: April 2026 - May 2026
15+
- **Details**: Create architectural designs, flow diagrams, and interface designs. Utilize industry best practices to ensure scalability and reliability.
16+
- **Success Criteria**: Design documents reviewed and approved, including architectural diagrams.
17+
18+
### Phase 3: Implementation
19+
- **Timeline**: June 2026 - November 2026
20+
- **Details**: Develop the replication module according to the approved design. Maintain code quality through regular code reviews and unit testing.
21+
- **Success Criteria**: All features implemented as per requirements with passing test cases (90% coverage).
22+
23+
### Phase 4: Testing
24+
- **Timeline**: December 2026 - January 2027
25+
- **Details**: Conduct extensive testing, including unit tests, integration tests, and performance tests to validate functionality and performance under load.
26+
- **Success Criteria**: Documented test results showing performance thresholds met and no critical defects.
27+
28+
### Phase 5: Deployment
29+
- **Timeline**: February 2027
30+
- **Details**: Prepare for production deployment. Create deployment scripts and rollback plans. Conduct staging environment tests.
31+
- **Success Criteria**: Successful deployment to staging; onboarding of monitoring and alerting systems.
32+
33+
### Phase 6: Monitoring and Maintenance
34+
- **Timeline**: March 2027 onwards
35+
- **Details**: Implement monitoring tools for performance and error tracking. Establish a maintenance plan for regular updates and support.
36+
- **Success Criteria**: System monitored successfully with alerts configured for critical errors. Regular updates performed without significant downtime.
37+
38+
## Conclusion
39+
This roadmap will guide the replication module from conceptualization to a fully operational state, ensuring that all requirements are met and that the system is robust, scalable, and maintainable. It serves as a living document and will be updated as needed throughout the project lifecycle.

0 commit comments

Comments
 (0)