Skip to content

Clean Amin1.0 branch from master #1760

Clean Amin1.0 branch from master

Clean Amin1.0 branch from master #1760

Triggered via pull request December 17, 2025 04:02
Status Failure
Total duration 6m 9s
Artifacts

tests.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
tests (3.12, numpy~=2.0)
Process completed with exit code 139.
tests (3.10, numpy==1.26.4)
The strategy configuration was canceled because "tests._3_12_numpy__2_0" failed
tests (3.10, numpy==1.26.4)
The operation was canceled.
tests (3.11, numpy==1.26.4)
The strategy configuration was canceled because "tests._3_12_numpy__2_0" failed
tests (3.11, numpy==1.26.4)
The operation was canceled.
tests (3.10, numpy~=2.0)
The strategy configuration was canceled because "tests._3_12_numpy__2_0" failed
tests (3.10, numpy~=2.0)
The operation was canceled.
tests (3.11, numpy~=2.0)
The strategy configuration was canceled because "tests._3_12_numpy__2_0" failed
tests (3.11, numpy~=2.0)
The operation was canceled.
tests (3.12, numpy==1.26.4)
The strategy configuration was canceled because "tests._3_12_numpy__2_0" failed
tests (3.12, numpy==1.26.4)
The operation was canceled.