Skip to content

cleaned code issues #26

cleaned code issues

cleaned code issues #26

Triggered via push September 13, 2025 17:33
Status Failure
Total duration 1m 23s
Artifacts

package-test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.9)
Process completed with exit code 2.
build (3.10)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed