5 Requirements
This section contains requirements for the system.
High-Level Active Requirements:
- req:cap ... Contains requirements about capturing events
- req:event ... Contains requirements about the structure of an event
- req:pub ... Contains requirements about how events are published
- req:qa ... Contains requirements about general quality assurance
- req:subs ... Contains requirements about event-subscriptions
Important Active Requirements:
- req:event.id ... Contains requirements about event-IDs
- req:pub ... Contains requirements about how events are published
IDs help to easily reference requirements. Requirement IDs may be grouped to create a hierarchy of requirements. IDs of sub-requirements are separated by a dot "." from the parent ID.
Note: IDs must not include any whitespace or - to keep IDs readable in wiki titles.
A requirement goes through the following phases:
-
Requirements are proposed, by creating feature-request issues
-
Once a requirement has enough information available to be implemented, it is ready, and must be documented in the wiki with a unique ID for tracing
-
A requirement in proposed or ready state may be declined, meaning that it will not be implemented, and must be removed from the wiki if it already exists
-
When the implementation of a requirement is merged, the requirement gets active, and the number of times the requirement is referenced is added to the wiki
Example:
# my_req: Some implemented requirement **References** - in branch main: 2If it is not possible to reference a requirement,
manualmay be set instead of the number of references. This marks the requirement as active, but requiring manual verification.Example:
# my_req: Requirement that needs manual verification **References** - in branch main: manualA manually verified requirement may get references in the future. The number of references is then added after the
manualkeyword.Example:
# my_req: Requirement that needs manual verification, but is also references in code **References** - in branch main: manual + 3 -
If a requirement is replaced or removed by another requirement, the requirement gets deprecated.
Since the requirement might still be active in some branches,
deprecatedmust be set manually to the branches the requirement is deprecated.The references list may be replaced by
**deprecated**if the requirement is deprecated in all branches.Note: A link should be added in the deprecated requirement, pointing to the new requirement for better traceability.
Examples:
# my_req: Got deprecated in latest version **References** - in branch main: deprecated - in branch stable: 2# my_req: Deprecated in all supported versions **deprecated** Deprecated by [req:new_req].
A requirement may be considered ready if it fulfills the following statements:
-
General:
- It is clear where the requirement must be placed in the wiki
- The ID for the requirement is decided and unique in the wiki
- All currently raised concerns by stakeholders are resolved
-
For high-level requirements:
- The intent of the requirement is covered by the existing sub-requirements
- All sub-requirements fulfill their Definition of Ready
Note: If the requirement does not fulfill these statements, try refining existing sub-requirements, or create additional ones.
-
For low-level requirements:
- At least one developer understands how to implement it
- Implementation is estimated to take less than two weeks for one developer
Note: If the requirement does not fulfill these statements, consider creating sub-requirements for it.
Please create an issue if you found any spelling mistakes.
You may also create an issue if you think the content of this wiki should be improved.
Note: This wiki is managed in its own repository. Any commits made using the edit button will be overwritten.
Note: Issues for the wiki are handled in the evident repository, but pull requests for the wiki are handled in the evident-wiki repository.
This wiki is MIT licensed, and works together with the evident crate.