Skip to content

Latest commit

 

History

History
77 lines (57 loc) · 2.5 KB

File metadata and controls

77 lines (57 loc) · 2.5 KB

JOBS - Active Work Tracker

Note: Completed jobs are archived to JOBS_COMPLETED.md

ACTIVE_JOBS

(none)

NEXT_UP

(empty)

RECENT_COMPLETED

Autonomous Orchestration System - 2026-02-13

  • Phase 0: Fix TS errors across codebase
  • Phase 1: State management files (STATE.md, CLAUDE.md protocol, JOBS.md format)
  • Phase 2: Project-level Claude config & slash commands
  • Phase 3: Resilience patterns (recover + checkpoint commands)
  • Phase 4: Quality gate hooks (git pre-commit)
  • Phase 5: New project bootstrap templates
  • Phase 6: Wire The Construct's own contract system

Dependency Updates & Cleanup - 2026-02-16

  • Merged Dependabot PRs: @types/node 25.2.3, sql.js 1.14.0, typescript-eslint 8.55.0
  • Separated export type in morpheus barrel files (isolatedModules compliance)
  • Added usage examples and orchestration docs

v1.0.1 Release - 2026-01-25

Dependencies & Code Quality:

  • Zod 3.x → 4.3.6 (breaking change handled)
  • ESLint 8 → 9 (migrated to flat config)
  • typescript-eslint 6 → 8
  • @types/node 20 → 25
  • Fixed 71 lint warnings → 0
  • Enforced --max-warnings 0 policy

Repository Setup:

  • Branch protection on main (PRs required for contributors)
  • Owner bypass enabled for direct pushes

Documentation:

  • Added 10 Matrix-themed architecture images
  • Updated README, GUIDE, architecture docs with new images
  • Updated CLAUDE.md with current project status

RELEASES

Version Date Highlights
v1.0.1 2026-01-25 Dependencies, lint fixes, branch protection
v1.0.0 2026-01-24 Initial release, 927 tests passing

COMPLETED_SUMMARY

All phases complete with 927 tests passing:

Core Architecture (Phases 1-5)

  • Phase 1: Foundation (74 tests)
  • Phase 2: Oracle & Level-Up (145 tests)
  • Phase 3: Multi-Provider Keymaker (187 tests)
  • Phase 4: Reference System & Registry (249 tests)
  • Phase 5: Full Sentinels QA (300 tests)

Security & Chaos (Phases 6-7)

  • Phase 6: Security Architecture - Agent Smith (349 tests)
  • Phase 7: Chaos Engineering - The Twins (410 tests)

Migration Wizard (Phase 8)

  • Phase 8a-i: Complete migration wizard with crew agents

Total: 927 tests passing