Replies: 2 comments 3 replies
-
|
The case is not only with sum of risks (displaying a correct number), but listing of them. Dear MONARC community,
|
Beta Was this translation helpful? Give feedback.
3 replies
-
|
Deployed in v2.11.1 |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
Describe the bug
For some assets that have received dependent assets through linking, their risk listing does not show the risks of the linked assets
To Reproduce
Steps to reproduce the behavior:
Expected behavior
correct summation of all risks from the selected asset, as well as all related assets
Screenshots



Desktop (please complete the following information):
Additional context
The case is not only with sum of risks (displaying a correct number), but listing of them.
The situation happens only with secondary assets, when there is a composition of secondary asset inside of another secondary asset.
By the logic we don't display children assets' risks when parent secondary is selected, but Edit Impact functionality will modify the children assets' risks values.
Beta Was this translation helpful? Give feedback.
All reactions