chore(deps): update dependency go #3284
Annotations
9 errors and 1 warning
|
filestest (receiver)
Process completed with exit code 1.
|
|
filestest (sender)
The strategy configuration was canceled because "filestest.receiver" failed
|
|
test-suite
Process completed with exit code 1.
|
|
servicestest (connect)
Process completed with exit code 1.
|
|
servicestest (expose)
The strategy configuration was canceled because "servicestest.connect" failed
|
|
servicestest (expose)
The operation was canceled.
|
|
vpntest (10.1.0.13/24, 10.1.0.11, download)
Process completed with exit code 1.
|
|
vpntest (10.1.0.11/24, 10.1.0.13)
The strategy configuration was canceled because "vpntest._10_1_0_13_24_10_1_0_11_d" failed
|
|
vpntest (10.1.0.11/24, 10.1.0.13)
The operation was canceled.
|
|
test-suite
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
connection
|
423 Bytes |
sha256:2c7a2724f88bbe7e8bb5d7cbeffc457b7be29e8357e6afb759e81e13329e7922
|
|
|
edgevpn
|
24.2 MB |
sha256:9012d79d7343ee1826a7ab55ac1e2d45269fd932a1c136da906a3af69ba7ab1b
|
|